05 — Handover & Support

Handover is where
accountability begins.

Handover should be more than a key exchange. We treat it as the formal transfer of a documented build. A complete documentation package, a defect inspection conducted with you, and a dedicated contact for the Defects Liability Period keep the next step clear.

Book a ConsultationHow We Build

What Handover Looks Like

The keys are not the handover. The documentation package is.

At handover, you receive a physical and digital archive of the work, inspections and certifications recorded during your project. Inspection records, engineer certificates, Defects Liability information, product manuals and as-built drawings — the information you need to verify the build record, raise a request, or pass the property on. We treat it as a deliverable with the same rigour as the build itself.

Finished residential entry threshold detail

What You Receive

The handover package.

Every inspection record, certificate, manual and drawing from your build, assembled in one place — physical and digital — so the full project history stays with the home rather than scattered across inboxes.

Inspection records from all four milestone stages
Structural engineer certificates and sign-offs
Project documentation relevant to your build
Product manuals and supplier information where provided
As-built drawings
Warranty cards and registration details for installed appliances and systems
Planning and building consent documentation
Maintenance schedule and care instructions
Named contact for Defects Liability Period requests
Completed threshold workmanship detail

Why Documentation Matters

This is not a folder of brochures.

You may not need it the week you move in. But when you refinance, renovate, raise a Defects Liability request or sell, the record of what was built, inspected and certified is already in your hands — not something you have to reconstruct years later from memory or missing paperwork.

Aftercare Process

What is confirmed after handover.

12 Weeks

Defects Liability Period

Eligible aftercare items raised after handover are handled through a documented request and review process.

At Handover

Handover Records

Inspection records, certificates, manuals, and project documentation are assembled for reference after handover.

After Handover

Support Contact

A dedicated point of contact helps with documentation questions, maintenance guidance, and Defects Liability requests.

Warranty Detail

Submit a Defects Liability request

If something needs attention after handover, the process is documented and straightforward.

Warranty
Living area opening onto planted courtyard

Want to Understand What You Receive at Handover?

Let's walk through the documentation and support process.

Book a free initial consultation. We can explain what goes into the handover package, how the 12-week Defects Liability Period works, and what to expect after handover.