Cyberidge Construction is pleased to share construction progress at 21 Surrey Rd, Keswick SA 5035.


A big thank you to our team and project partners for their continued hard work and professionalism. More updates to come as we move through the next stages.
March 2025 — Site Preparation
Site prepared — the previous structure demolished and the land levelled.
April 2025 — Foundation
Footings and concrete foundation in place — the base slab poured.
December 2025 — Steel Frame
Steel framing — the two-storey steel frame structure being erected on site.