What Level 3, 4 and 5 mean in the manufacturers’ guides, how glancing light shows up joints, when a Level 5 finish is recommended, and how to write it into a contract

Published

Siniat’s Blueprint manual (April 2025) says the plasterboard standard AS/NZS 2589:2017 “nominates Level 4 as the default finish unless otherwise specified”. In the manufacturers’ guides, Level 5 adds a coating over the entire surface and, in Siniat’s words, “Higher standards are required for frame flatness, jointing and back-blocking.” So a Level 5 finish is something that has to be asked for. The standard’s text is not reproduced here. Instead, this note quotes two plasterboard manufacturers’ public guides: Gyprock’s Levels of Finish page and its Glancing Light brochure, and Section 7.1 of Siniat’s Blueprint. Both describe three levels, 3, 4 and 5.

A worker using a long-handled power sander on a plasterboard ceiling with white jointing compound over the joints, beside a window

What do plasterboard finish levels 3, 4 and 5 mean?

Gyprock’s Levels of Finish page says AS/NZS 2589:2017 “defines three levels of finish for plasterboard walls and ceilings and provides minimum specifications for the installation process, from framing preparation to finishing, to achieve each of the finishes.” Its Glancing Light brochure, with a 2018 copyright line, cites the 2007 edition of the same standard in the same words.

Level 3, in Gyprock’s words, is “For use in areas that do not require a finish, such as above ceilings and inside service shafts and other inaccessible spaces. All joints are to be taped with two applications of compound and all fastener heads are to be covered.”

Level 4, Gyprock says, “is the generally accepted level of finish for domestic construction. Joints are to follow a three coat system, consisting of; a tape coat plus two subsequent coats applied over the tape coat and fastener heads. All joint compounds should be sanded to a smooth finish free of tool marks and ridges.” The page recommends “A flat, matt or low sheen, light coloured paint finish”.

Level 5, on the same page, “requires a high level of frame alignment to ensure a smoother surface.” After sanding, the joints are followed by “the application of a skim coat to remove differential surface textures and porosity.” Gyprock describes a skim coat as a thin finish coat, rolled, trowelled or airless sprayed, “normally less than 1mm in thickness”, applied “over the entire plasterboard surface”.

Level 4 vs Level 5 plaster: what is the difference?

The difference in the guides is not the joints alone. The Glancing Light brochure, which carries a 2018 copyright line and a July 2014 print code and is written against the 2007 edition of the standard, says that for Level 5 “A three coat jointing system is required as for Level 4”. What Level 5 adds is a coat over the whole surface, and a tighter frame.

Siniat’s Blueprint lists the requirements for a Level 5 finish as framing to its Table 1, “Back-blocking of all ceiling joints and wall butt joints”, joints finished with its three coat jointing system, “Application of an additional coating over the entire surface to provide uniform texture and porosity”, and “A quality three coat paint system”. Its Level 4 list also includes framing and back-blocking to Table 1, face layer joints finished with the three coat jointing system, and a quality three coat paint system. For Level 5 it says “Higher standards are required for frame flatness, jointing and back-blocking.”

The frame comes first in both guides. Siniat states: “Before installing plasterboard, the frame must be flat enough for the required level of finish.” Its Table 1 sets a smaller allowable frame deviation for Level 5 than for Level 4. The figures are not repeated here, because they track the standard. Frame stage, before any sheet goes up, is when that flatness is set.

What is glancing light, or critical lighting?

Gyprock’s Glancing Light brochure defines it as “a condition which exists when light hits the plasterboard surface at an acute angle and casts shadows that highlight any surface irregularities.” It adds that on walls and ceilings “this can make the surface look uneven and highlight the appearance of joints.”

The brochure explains why: “some surface variation is inevitable” because of natural variations in the framing, the hand-finished nature of a plasterboard wall or ceiling, and subtle differences between the textures of plasterboard and the jointing compounds. It says that “Under the majority of lighting conditions” a Level 4 surface “will appear flat”, and that in critical lighting conditions glancing light “will highlight any surface variations.”

The situations it lists include floor to ceiling windows, windows directly adjacent to walls, unshaded batten holder ceiling lights, ceiling mounted fluorescent lights, “Wall lights and downlights close to walls”, windows at the end of long corridors, brightly lit rooms, lights installed just below skillion or raked ceilings, and reflections of light from water features.

When is a Level 5 plaster finish recommended?

Gyprock’s Levels of Finish page says Level 5 “should be used wherever” one of three things applies: “critical light conditions occur such as from windows, skylights, or silhouette and spot lighting”, “gloss or semi-gloss paints are to be used”, or “paint is mid or dark coloured”. Siniat’s list is close but not identical: Level 5 is recommended “where gloss, semi-gloss or dark colour paints are used, or in harsh or critical lighting conditions which are referred to as glancing light.” It does not mention mid tones.

On paint sheen, the Glancing Light brochure says that satin, semi gloss and gloss “can accentuate any minor variations in the surface and are recommended only for use over a level 5 finish.” On colour: “In rooms where a dark colour is to be used a level 5 finish is recommended.”

Neither guide promises a perfect result. Gyprock says that for areas which may be subject to glancing light, a Level 5 finish “is strongly recommended to reduce critical lighting effects, but it cannot be expected to totally alleviate any glancing light issues.” Siniat says that “Even if completed correctly, a Level 5 Finish may not result in all surface deviations being concealed, only minimised.”

The brochure also names design choices that reduce the effect: windows that do not abut walls or ceilings, external shading, running sheets so that long joints are parallel to the direction of the light, longer sheets to reduce butt joints, and diffused rather than grazing light sources.

How is the level of finish specified in a building contract?

Gyprock’s advice is about timing: “It is important to specify the level of finish required in each area of the home during the design phase to avoid disappointment in the final result.” Because Siniat records Level 4 as the default “unless otherwise specified”, a Level 5 finish that is wanted but not written down may not be the finish that is priced or built.

In practice that means the documents the house is built from name the level, room by room or surface by surface, for example a Level 5 finish to the living room ceiling and the wall beside a full-height window. The specification is the written part of the documentation set that states materials, finishes and workmanship standards. The paint sheen and colour belong in the same place, because both guides tie the level to the paint.

Adding a Level 5 finish after the contract is signed is a change to what was agreed. How a change is agreed, priced and recorded is set by that contract.

How is a plaster finish checked at handover?

The first check is the documents: which level was specified for which surface, and with what paint. Then the surfaces themselves.

Gyprock’s brochure quotes a viewing standard from the Victorian Building Commission’s 2007 Guide to Standards and Tolerances, an edition since replaced in Victoria: surfaces “are to be viewed where possible from a normal viewing position”, meaning “a distance of 1.5m or greater (600 mm for appliances and fixtures)” with the surface lit by “non-critical light”, which is light that “is diffused and is not glancing or parallel to that surface.” That is an earlier Victorian guide quoted by a manufacturer. This note did not find a South Australian equivalent, and does not say there is none.

The handover inspection note on this site suggests looking at plaster under different light, including a torch held low along the surface, which shows unevenness a direct view misses. The two approaches answer different questions. A low torch creates glancing light, and the brochure says glancing light “will highlight any surface variations” even on a Level 4 surface that appears flat in ordinary light. What it finds is worth recording; whether it is a defect is not settled by the torch alone. The level specified, the contract and the statutory warranties all bear on it, and a dispute may need independent assessment.

Common Questions

What is a Level 5 plaster finish in Australia?

Gyprock’s Levels of Finish page and Siniat’s Blueprint v4 (April 2025) describe plasterboard finish levels by reference to AS/NZS 2589:2017. Gyprock’s page describes Level 5 as requiring a high level of frame alignment, joints sanded smooth, and then a skim coat over the entire plasterboard surface “to remove differential surface textures and porosity.” Siniat’s Blueprint also requires back-blocking of all ceiling joints and wall butt joints for Level 5 (it requires back-blocking in some cases for Level 4 as well).

Is Level 4 or Level 5 the standard plaster finish for a house?

Gyprock’s Levels of Finish page calls Level 4 “the generally accepted level of finish for domestic construction”, and Siniat’s Blueprint (April 2025) says AS/NZS 2589:2017 “nominates Level 4 as the default finish unless otherwise specified.” A Level 5 finish therefore needs to be specified in the building documents.

When do the manufacturers recommend a Level 5 plaster finish?

Gyprock’s Levels of Finish page (read November 2026) recommends Level 5 where critical light conditions occur, such as from windows, skylights, or silhouette and spot lighting; where gloss or semi-gloss paints are used; and where paint is mid or dark coloured. Siniat’s Blueprint v4 (April 2025) recommends it where gloss, semi-gloss or dark colour paints are used, or in harsh or critical lighting conditions, which it calls glancing light; it does not mention mid tones.

Does a Level 5 finish get rid of glancing light marks?

Not entirely, according to the manufacturers. Gyprock’s Levels of Finish page and its 2018 Glancing Light brochure say Level 5 is strongly recommended to reduce critical lighting effects “but it cannot be expected to totally alleviate any glancing light issues”, and Siniat’s Blueprint v4 (April 2025) says even a correctly completed Level 5 finish may leave surface deviations “only minimised”.

What is critical lighting on plasterboard?

Gyprock’s Glancing Light brochure (2018) describes glancing light as light that hits the plasterboard surface at an acute angle and casts shadows that highlight surface irregularities and joints. Its examples include floor to ceiling windows, windows beside walls, unshaded ceiling lights, and wall lights and downlights close to walls.

Sources

This page describes these sources as they stood on the access dates above. It is not legal advice about any particular property.