A pitched roof on a new house can be framed with prefabricated trusses or with rafters cut and assembled on site, often called a cut roof. For timber, NCC 2022 Volume Two clause H1D6(4) lists AS 1720.5 for the “Design of nailplated timber roof trusses” and AS 1684 for residential timber-framed construction; for steel, H1D6(3) lists the NASH Standard, AS 4100 and AS/NZS 4600. These are Deemed-to-Satisfy routes, with a Performance Solution as the alternative. This note quotes NCC 2022. The ABCB records that NCC 2025 was published on 1 May 2026, and lists South Australia as “BCA: 1 May 2027” and “PCA: 1 May 2026”. Which edition applies to a particular application is for the relevant authority assessing the building work to confirm.

What is the difference between roof trusses and rafters?
WoodSolutions, published by Forest and Wood Products Australia, describes prefabricated timber roof trusses as “factory-assembled and connected by pressed metal nail plates”. It describes conventional roof framing as “individual rafters, ridge boards, ceiling joists and collar ties, cut and assembled on site”.
The same guide states: “AS 1684 includes provisions for both approaches. In either case, trusses and rafters must be correctly tied down and braced to resist uplift and lateral loads.”
The NCC itself does not choose between them. Clause H1D6(1) states that diagrams of framing members “and associated terminology used to describe them” are set out in figures that “in most cases are applicable for both steel and timber frame members”, including Figure H1D6d, “Typical roof framing members”.
Which Australian Standards apply to timber roof trusses?
Clause H1D6(4) of Volume Two states that Performance Requirement H1P1 “is satisfied for timber framing if it is designed and constructed in accordance with the following, as appropriate:” “(a) Design of timber structures: AS 1720.1.” “(b) Design of nailplated timber roof trusses: AS 1720.5.” “(c) Residential timber-framed construction – non-cyclonic areas: AS 1684.2 or AS 1684.4.” “(d) Residential timber-framed construction – cyclonic areas: AS 1684.3.” “(e) Installation of particleboard flooring: AS 1860.2.”
Clause 2.2.4(i) of the Housing Provisions points the same way, listing “Timber construction (including design of timber structures, timber framing and design of nail-plated timber roof trusses): H1D6.” Section 6 of the Housing Provisions covers subfloor ventilation and structural steel members (6.1.1(1)); for steel framing, timber framing and structural software, clause 6.1.1(2) refers readers to H1D6(3), H1D6(4) and H1D6(7).
The NCC 2022 referenced documents list AS 1720.5 in its 2015 edition, “Timber structures — Nailplated timber roof trusses (incorporating amendment 1)”. AS 4440 is not listed in the referenced-documents tables read for this note. Under clause A2G1(2), a Performance Solution is the alternative to these Deemed-to-Satisfy routes.
What about steel roof trusses and steel beams in a cut roof?
Clause H1D6(3) states that H1P1 “is satisfied for steel framing if it is designed and constructed in accordance with one of the following”: the NASH Standard ‘Residential and Low-Rise Steel Framing’ Part 1 for design and Part 2 for design solutions; AS 4100, “Steel structures”; or AS/NZS 4600, “Cold-formed steel structures”.
In a rafter-framed roof, structural steel strutting beams can carry roof and ceiling loads. Clause 6.3.2(1)(b) lists “Strutting beams supporting roof and ceiling loads — in accordance with 6.3.4”, and clause 6.3.4 sets their spacing for “single span rafters” and “continuous span rafters”, their spans for metal sheet and tiled roofs, and states: “Any point load applied must be located within the middle third of the strutting beam.”
Clause 6.3.1(1) states that Part 6.3, “other than clause 6.3.4”, “applies subject to the limitations set out in H1D6(6)”. Separately, H1D6(5)(c) lists Part 6.3 as a Deemed-to-Satisfy route for structural steel sections “subject to (6)”, and H1D6(6) states that Part 6.3 “may only be used where—” conditions are met, including that “the building is located in an area with a wind class of not more than N3”. The notes to the 6.3.4 span tables state the roof wind pressures the tables account for. The note does not resolve how these provisions fit together for a proposed strutting-beam design; that is for the relevant authority assessing the building work to confirm. Clause 6.3.1(2) states that Part 6.3 “need not be complied with if H1D6(5)(a) or (b) are complied with”, that is, design to AS 4100 or AS/NZS 4600.
Who designs roof trusses, and what does the NCC say about truss software?
The NCC does not name who designs trusses. It regulates the software. Clause 2.2.5(1) of the Housing Provisions states that structural software using Deemed-to-Satisfy design criteria “for the design of steel or timber trussed roof and floor systems and framed building systems, must comply with the ABCB Protocol for Structural Software.” Clause H1D6(7)(a) of Volume Two sets the same requirement for software using criteria based on the Deemed-to-Satisfy Provisions of Section H.
The two clauses then frame the size limits differently. Clause 2.2.5(2) states that the requirements of (1) “only apply to structural software used to design steel or timber trussed roof and floor systems and framed building systems for buildings within the following geometrical limits”, while clause H1D6(7)(b) states that such software “can only be used for buildings within the following geometric limits”. The limits are: ground level to the underside of eaves not more than 6 m; ground level to the highest point of the roof, “neglecting chimneys”, not more than 8.5 m; building width including roofed verandahs, excluding eaves, not more than 16 m; building length not more than five times the width; and roof pitch not more than 35 degrees.
Clause 2.2.5(3) states that the requirement does not apply “to design software for individual frame members such as electronic tables similar to those provided in” AS 1684 Parts 2, 3 and 4 or NASH Standard Part 2. The explanatory information to H1D6 adds that H1D6(7) “does not apply where a software package simply eliminates manual calculations and the process of the package requires identical methodology as that undertaken manually, e.g. AS 1684 span tables and bracing calculations.”
Does the roof covering affect the roof framing?
Clause H1D7(3)(b) lists two Deemed-to-Satisfy routes for roof tiles: AS 2050, or Part 7.3 of the Housing Provisions provided “the building is located in an area with a wind class of not more than N3”, the tiles comply with AS 2049 and “the roof has a pitch of not less than 15 degrees and not more than 35 degrees.” For metal sheet roofing, H1D7(2)(c) lists Part 7.2 of the Housing Provisions, “provided the building is located in an area with a wind class of not more than N3.”
Clause 6.3.4(b) gives separate strutting beam span tables for metal sheet roofs and tiled roofs. The explanatory information to clause 2.2.4 adds: “The weight of roof or ceiling insulation, particularly if additional ceiling insulation is used for compliance with the energy efficiency provisions, needs to be considered in the selection of plasterboard, plasterboard fixings and building framing.”
Does South Australia vary the roof framing rules?
No South Australian variation to H1D6, H1D7, Part 2.2 or Part 6.3 was found. South Australia’s schedule to Volume Two Part H1 contains one entry, which deletes H1P2 (buildings in flood areas); H1D6 and H1D7 are not varied. South Australia’s Housing Provisions variations are to Parts 4.2, 9.2, 10.2 and 13.1 and the referenced documents, and its referenced-documents table does not list AS 1684, AS 1720 or the NASH Standard.
Is there a roof truss inspection in South Australia?
Regulation 93(1) of the Planning, Development and Infrastructure (General) Regulations 2017 prescribes the notifications given to the council during building work: notice of the intended commencement of building work; of the commencement or completion of “any stage of the building work specified by the council” when development approval is granted; of “any stage specified by a relevant authority when giving a building consent”; of installing a designated building product on a designated building; and of the intended completion of the building work.
The regulation does not name a roof framing or truss stage. Whether that stage is specified for a particular house is set out in its consent and approval documents, and what a frame-stage check can cover is set out in the frame inspection checklist. The trusses or rafters, steel beams and tie-down details are recorded in the project’s drawings, truss layouts and engineering, and whether they meet H1D6 or rely on a Performance Solution is for the relevant authority assessing the building work to confirm.
Common Questions
What is the difference between a truss roof and a cut roof?
WoodSolutions, published by Forest and Wood Products Australia, describes prefabricated timber roof trusses as “factory-assembled and connected by pressed metal nail plates”, and conventional roof framing as “individual rafters, ridge boards, ceiling joists and collar ties, cut and assembled on site”. It states that AS 1684 “includes provisions for both approaches” and that in either case “trusses and rafters must be correctly tied down and braced to resist uplift and lateral loads.”
Which Australian Standard applies to timber roof trusses?
NCC 2022 Volume Two H1D6(4) lists AS 1720.5 for nailplated timber roof truss design and AS 1720.1 for timber structure design; for residential timber-framed construction, it lists AS 1684.2 or AS 1684.4 in non-cyclonic areas and AS 1684.3 in cyclonic areas, as appropriate. These are Deemed-to-Satisfy routes. The NCC 2022 referenced documents list AS 1720.5 in its 2015 edition incorporating amendment 1. A Performance Solution is the alternative under clause A2G1(2). No South Australian variation to H1D6 was found.
Does truss design software have to meet an NCC requirement?
Clause 2.2.5 of the NCC 2022 Housing Provisions, and clause H1D6(7) of Volume Two, require structural software that uses Deemed-to-Satisfy design criteria for steel or timber trussed roof and floor systems and framed building systems to comply with the ABCB Protocol for Structural Software. Clause 2.2.5(2) of the Housing Provisions states that this requirement “only appl[ies]” to software for buildings within listed geometric limits, while clause H1D6(7)(b) of Volume Two states that such software “can only be used for buildings within” those limits; they include a roof pitch not exceeding 35 degrees and a building width, including roofed verandahs and excluding eaves, not exceeding 16 m. The requirement does not apply to software for individual frame members such as electronic span tables similar to those in AS 1684.
Can steel be used for roof framing under the NCC?
NCC 2022 Volume Two clause H1D6(3) states that steel framing satisfies Performance Requirement H1P1 if designed and constructed in accordance with the NASH Standard ‘Residential and Low-Rise Steel Framing’ Parts 1 and 2, AS 4100 or AS/NZS 4600. Structural steel strutting beams supporting roof and ceiling loads are covered by clause 6.3.4 of the Housing Provisions, which sets their spacing for single and continuous span rafters and their spans for metal sheet and tiled roofs. NCC 2022 H1D6(5)(c) refers to Part 6.3 subject to H1D6(6), including its N3 limit, while Housing Provisions 6.3.1(1) expressly excludes clause 6.3.4 from its reference to those limitations; their application to a proposed strutting-beam design should be confirmed with the relevant authority assessing the building work.
Is there a mandatory roof truss inspection in South Australia?
Regulation 93(1) of South Australia’s Planning, Development and Infrastructure (General) Regulations 2017 prescribes notifications to the council, not inspections. Regulation 93(1) prescribes advance notice of intended commencement and completion of building work, specified stages, and the intended commencement of designated-product installation on a designated building; the applicable notice periods depend on the relevant paragraph. It does not name a roof truss stage; whether one is specified for a particular house is set out in its consent and approval documents.
Sources
- NCC 2022 Volume Two — Part H1 Structure (H1P1, H1D6 framing, H1D7 roof and wall cladding)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Part 2.2 Structural provisions (clauses 2.2.4 and 2.2.5)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Part 6.1 Scope and application of Section 6 (clause 6.1.1)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Part 6.3 Structural steel members (clauses 6.3.1, 6.3.2, 6.3.4)Accessed 2026-11-23
- NCC 2022 Volume Two — Part A2 Compliance with the NCC (A2G1)Accessed 2026-11-23
- NCC 2022 Volume Two — Schedule 2 Referenced documents (AS 1684, AS 1720.5, NASH Standard, Protocol for Structural Software)Accessed 2026-11-23
- NCC 2022 Volume Two — Schedule 8 South Australia, Part H1 Structure (SA H1P2)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Schedule 8 South Australia (index of variations)Accessed 2026-11-23
- WoodSolutions (Forest and Wood Products Australia) — Lightweight Timber Framing GuideAccessed 2026-11-23
- Planning, Development and Infrastructure (General) Regulations 2017 (SA), version 29.10.2026 — regulation 93Accessed 2026-11-23
- ABCB — NCC 2025 state and territory adoption informationAccessed 2026-11-23
This page describes these sources as they stood on the access dates above. It is not legal advice about any particular property.
Planning a rebuild or new build in Adelaide? Start with a free initial consultation.