The minimum height of a slab above the ground and the fall of the ground away from a house both sit in one clause of the NCC 2022 Housing Provisions, clause 3.3.3 “Surface water drainage”. It states that “Surface water must be diverted away from a Class 1 building” and sets the slab-on-ground at not less than 100 mm, 50 mm or 150 mm above the external finished surface depending on the case, with the surrounding ground graded at not less than 25 mm or 50 mm over the first 1 m. These are Deemed-to-Satisfy Provisions: one way of meeting the Performance Requirement, alongside other listed routes and a Performance Solution. This note quotes NCC 2022. The ABCB records that NCC 2025 was published on 1 May 2026, and lists South Australia as “BCA: 1 May 2027” and “PCA: 1 May 2026”. Which edition applies to a particular application is for the relevant authority assessing the building work to confirm.

What is the minimum slab height above ground in the NCC?
Clause 3.3.3(b) of the Housing Provisions, headed “Slab-on-ground — finished slab heights”, states that “the height of the slab-on-ground above external finished surfaces must be not less than (see Figure 3.3.3a)—” and lists three cases:
(i) “100 mm above the finished ground level in low rainfall intensity areas or sandy, well-drained areas; or”
(ii) “50 mm above impermeable (paved or concrete) areas that slope away from the building in accordance with (a); or”
(iii) “150 mm in any other case.”
The footings Part points back to the same clause. In the national text of clause 4.2.3, on excavation for footings, subclause (7) states: “The height of a finished slab-on-ground must be in accordance with 3.3.3(b).” The glossary defines finished ground level as “The ground level adjacent to footing systems at the completion of construction and landscaping.”
How much should the ground fall away from the house?
Clause 3.3.3(a), headed “Slab-on-ground — finished ground level adjacent to a building”, states that “the external finished surface surrounding the slab must be drained to move surface water away from the building and graded to give a slope of not less than (see Figure 3.3.3a)—”
(i) “25 mm over the first 1 m from the building—” either “in low rainfall intensity areas for surfaces that are reasonably impermeable (such as concrete or clay paving)” or “for any reasonably impermeable surface that forms part of an access path or ramp provided for the purposes of Clauses 1.1(2) or (4)(c) of the ABCB Standard for Livable Housing Design”; or
(ii) “50 mm over the first 1 m from the building in any other case.”
The clause carries a limitation: “3.3.3 does not apply to a landing area provided for the purposes of Clause 2.3 of the ABCB Standard for Livable Housing Design, except for a channel drain or drainage surface provided under Clause 2.4 of that standard.” Where a house is raised on a suspended floor instead of a slab, clause 3.3.3(c) states that “The ground beneath suspended floors must be graded so that the area beneath the building is above the adjacent external finished ground level and surface water is prevented from ponding under the building”.
What is a low rainfall intensity area?
Two of the figures above depend on whether the site is in a “low rainfall intensity area”. The Housing Provisions glossary defines it as “An area with a 5 minute rainfall intensity for an annual exceedance probability of 5% of not more than 125 mm/hour.” Its explanatory information adds: “Rainfall intensity figures can be obtained from Table 7.4.3d in the ABCB Housing Provisions.”
Table 7.4.3d, in the gutters and downpipes Part, lists 5 minute duration rainfall intensities by locality. For a 5% annual exceedance probability it lists Adelaide at 120 mm/h, “Gawler, Adelaide” at 111 mm/h and Port Augusta at 133 mm/h, among other South Australian localities. A note to the table states: “Locations used in this table are based on the nearest Bureau of Meteorology grid cell latitude and longitude to the central Post Office of each city or town.”
The first case in 3.3.3(b), the 100 mm figure, also names “sandy, well-drained areas”. Which locality figure, which ground conditions and therefore which case of 3.3.3(a) and (b) a particular site falls under are recorded in the design documents and are for the relevant authority assessing the building work to confirm.
Where does clause 3.3.3 sit in the NCC, and is it the only option?
Performance Requirement H2P1 in Volume Two deals with rainwater management. Among other things, H2P1(2) states: “Surface water, resulting from a storm having an annual exceedance probability of 1% must not enter the building.”
Clause H2D2 states that H2P1 “is satisfied for drainage if it is designed and constructed in accordance with” either AS/NZS 3500.3, or, “provided the stormwater drainage system otherwise complies with (a), Part 3.3 of the ABCB Housing Provisions” for drainage of roofs in the listed rainfall areas, “sub-soil areas where excessive soil moisture problems may occur” and “land adjoining and under buildings.” Clause 3.3.1 states that Part 3.3 is subject to the limitations in H2D2(b) and “need not be complied with if H2D2(a) is complied with.”
Above that sits clause A2G1(2): Performance Requirements are satisfied by a Performance Solution, a Deemed-to-Satisfy Solution, or a combination of the two. The 100, 50 and 150 mm figures are therefore Deemed-to-Satisfy figures, not the only way a design can meet H2P1.
The explanatory information to H2D2 states: “The NCC does not require the installation of drainage systems. Accordingly these requirements need only be applied when these systems are used.” Clause 3.3.2(a) separately lists “Areas adjoining and under buildings — surface water drainage in accordance with 3.3.3”. Clause 3.3.3 itself opens: “Surface water must be diverted away from a Class 1 building as follows:”
Does South Australia change the slab height or ground fall rules?
No South Australian variation to clause 3.3.3 or H2D2 was found. The South Australian schedule to the Housing Provisions varies Parts 4.2, 9.2, 10.2 and 13.1 and the referenced documents; its Part 4.2 page replaces clause 4.2.8 (the damp-proofing membrane) and clause 4.2.10 (concrete), not clause 4.2.3. SA 4.2.8(c) states that the membrane “must be placed beneath the slab so that the bottom surface of the slab is entirely underlaid and extends under edge beams to finish at ground level in accordance with Figure 4.2.8.”
The South Australian schedule to Volume Two Part H2 replaces H2P3 (rising damp) and H2D4(2), and inserts SA H2D4(3) and (4). SA H2D4(4) deals with the height of a damp-proof course in masonry, not the slab: in low rainfall intensity areas where the site classification is one of those listed in accordance with AS 2870, it allows the damp-proof course height to be “15 mm above finished paved, concreted or landscaped areas” or “0 mm if the damp-proof course is protected from the direct effects of the weather by a carport, verandah or the like.”
Why does the height of the slab above the ground matter?
The explanatory information to clause 3.3.3, which is guidance rather than a requirement, states: “The appropriate slab height above finished ground level and the slope of the external finished surface surrounding the slab may vary depending on the following:” and lists five factors:
“The local plumbing requirements; in particular the height of the overflow relief gully relative to drainage fittings and ground level (to work effectively they must be a minimum of 150 mm below the lowest sanitary fixture).” “The run-off from storms, particularly in areas of high rainfall intensity, and the local topography.” “The effect of excavation on a cut and fill site.” “The possibility of flooding.” “Termite risk management provisions.”
On termites, Table 3.4.2 of the Housing Provisions lists “Slab edge exposure” as one of the options for the slab perimeter or external wall perimeter of a concrete slab-on-ground, alongside sheet material, granular material and chemical systems. The table does not set dimensions; whether a house needs a termite management system, and which kind, is covered in the termite note.
Who confirms the slab and ground levels for a new house?
The finished floor level, the finished ground and paving levels around the house and the drainage design are recorded in the drawings and specification. The glossary definition of finished ground level refers to the ground level “at the completion of construction and landscaping”, so paving and landscaping planned around the house are worth checking against those drawn levels.
Whether a design meets clause 3.3.3, AS/NZS 3500.3 under H2D2(a), or relies on a Performance Solution is for the relevant authority assessing the building work to confirm. Where stormwater goes once it leaves the slab surrounds is covered in a separate note.
Common Questions
What is the minimum height of a slab above ground in Australia?
Clause 3.3.3(b) of the NCC 2022 Housing Provisions, a Deemed-to-Satisfy Provision, sets the height of a slab-on-ground above external finished surfaces at not less than “100 mm above the finished ground level in low rainfall intensity areas or sandy, well-drained areas”, “50 mm above impermeable (paved or concrete) areas that slope away from the building in accordance with (a)”, or “150 mm in any other case.” The limitation to NCC 2022 clause 3.3.3 excludes a landing area provided for Clause 2.3 of the ABCB Standard for Livable Housing Design, except for a channel drain or drainage surface provided under Clause 2.4 of that Standard. A Performance Solution, or the AS/NZS 3500.3 route in H2D2(a), are other ways of meeting Performance Requirement H2P1.
How much fall away from the house does the NCC require?
Clause 3.3.3(a) of the NCC 2022 Housing Provisions, a Deemed-to-Satisfy Provision, requires the external finished surface around a slab-on-ground to be graded to a slope of not less than 50 mm over the first 1 m from the building, or 25 mm over the first 1 m for reasonably impermeable surfaces such as concrete or clay paving in low rainfall intensity areas, and for reasonably impermeable surfaces forming part of an access path or ramp “provided for the purposes of Clauses 1.1(2) or (4)(c) of the ABCB Standard for Livable Housing Design”. The clause does not apply to a landing area provided for Clause 2.3 of that Standard, except for a channel drain or drainage surface under its Clause 2.4. A Performance Solution, or the AS/NZS 3500.3 route in H2D2(a), are other ways of meeting H2P1.
How does the NCC define a low rainfall intensity area?
The NCC 2022 Housing Provisions glossary defines a low rainfall intensity area as “An area with a 5 minute rainfall intensity for an annual exceedance probability of 5% of not more than 125 mm/hour.” Its explanatory information points to Table 7.4.3d of the Housing Provisions for rainfall intensity figures, and a note to that table states: “Locations used in this table are based on the nearest Bureau of Meteorology grid cell latitude and longitude to the central Post Office of each city or town.” Which figure, and which case of clause 3.3.3, applies to a particular site is for the relevant authority assessing the building work to confirm.
Does South Australia vary the NCC slab height rule?
No South Australian variation to clause 3.3.3 of the NCC 2022 Housing Provisions, or to Volume Two clause H2D2, was found. South Australia’s Part 4.2 variations replace clauses 4.2.8 (damp-proofing membrane) and 4.2.10 (concrete), and SA H2D4(4) allows the damp-proof course height in masonry, in low rainfall intensity areas with listed AS 2870 site classifications, to be 15 mm above finished paved, concreted or landscaped areas, or 0 mm where protected by a carport, verandah or the like. That is a damp-proof course height, not a slab height.
Does later paving or landscaping count when measuring slab height?
The NCC 2022 Housing Provisions measure the slab height in clause 3.3.3(b) above “external finished surfaces”, and the glossary defines finished ground level as “The ground level adjacent to footing systems at the completion of construction and landscaping.” How the levels shown in the drawings apply to a particular house is for the relevant authority assessing the building work to confirm.
Sources
- NCC 2022, ABCB Housing Provisions — Part 3.3 Drainage (clauses 3.3.1 to 3.3.3 and explanatory information)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Part 4.2 Footings, slabs and associated elements (clauses 4.2.3 and 4.2.8)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Part 3.4 Termite risk management (Table 3.4.2)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Part 7.4 Gutters and downpipes (Table 7.4.3d rainfall intensities)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Schedule 1 Definitions, Glossary (finished ground level, low rainfall intensity area)Accessed 2026-11-23
- NCC 2022 Volume Two — Part H2 Damp and weatherproofing (H2P1, H2D2)Accessed 2026-11-23
- NCC 2022 Volume Two — Part A2 Compliance with the NCC (A2G1)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Schedule 8 South Australia (index of variations)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Schedule 8 South Australia, Part 4.2 (SA 4.2.8, SA 4.2.10)Accessed 2026-11-23
- NCC 2022 Volume Two — Schedule 8 South Australia, Part H2 Damp and weatherproofing (SA H2P3, SA H2D4)Accessed 2026-11-23
- ABCB — NCC 2025 state and territory adoption informationAccessed 2026-11-23
This page describes these sources as they stood on the access dates above. It is not legal advice about any particular property.