In the NCC 2022 Housing Provisions, the thermal break clauses call for a material with an R-Value of at least 0.2 between metal framing and the cladding or roofing fixed to it. Clause 13.2.3(7) requires one in certain metal roofs and clause 13.2.5(5) in certain metal-framed external walls, each only where the conditions in the clause are met. Separate clauses, 13.2.3(3), 13.2.5(4) and 13.2.6(3), deal with thermal bridging through metal-framed roofs, walls and floors. The clauses say “metal” and “metal-framed” rather than naming steel. This note quotes NCC 2022. The ABCB records that NCC 2025 was published on 1 May 2026, and lists South Australia as “BCA: 1 May 2027” and “PCA: 1 May 2026”. Which edition applies to a particular application is for the relevant authority assessing the building work to confirm.

What is a thermal break, and how is it different from thermal bridging?
The NCC 2022 Glossary has no entry for “thermal break”. The clauses themselves describe it as a material with an R-Value of not less than R0.2 installed between metal framing and the roofing or cladding fixed to it. The Glossary defines R-Value as “The thermal resistance of a component calculated by dividing its thickness by its thermal conductivity, expressed in m2.K/W.”
The explanatory information to clause 13.2.5 states: “Because of the high thermal conductance of metal, a thermal break is needed when a metal framing member directly connects the external cladding to the internal lining or the internal environment.”
Thermal bridging is handled by different subclauses. The Glossary defines Total R-Value as “The sum of the R-Values of the individual component layers in a composite element including any building material, insulating material, airspace, thermal bridging and associated surface resistances, expressed in m2.K/W.” The thermal bridging subclauses use that Total R-Value, or listed extra insulation, to account for heat passing through the framing members.
When does a metal roof need a thermal break?
Clause 13.2.3(7) states: “A roof that— has metal sheet roofing directly fixed to metal purlins, metal rafters or metal battens; and does not have a ceiling lining or has a ceiling lining fixed directly to those metal purlins, metal rafters or metal battens, must have a thermal break, consisting of a material with an R-Value of greater than or equal to 0.2, installed between the metal sheet roofing and its supporting metal purlins, metal rafters or metal battens.”
Both conditions are joined by “and”: the roofing is fixed directly to metal purlins, rafters or battens, and there is either no ceiling lining or a lining fixed directly to those same members.
Clause 13.2.3(8) states: “The requirements of (1) to (7) do not apply to roofs constructed using insulated sandwich panels.” Clause 13.2.3(9) sets a separate minimum Total R-Value for sandwich panel roofs in Table 13.2.3x.
When does a steel-framed wall need a thermal break?
Clause 13.2.5(5) states: “A metal-framed wall that forms part of the building envelope must have a thermal break, consisting of a material with an R-Value of not less than R0.2, installed at all points of contact between the external cladding and the metal frame if the wall— does not have a wall lining or has a wall lining that is fixed directly to the metal frame; and is clad with weatherboards, fibre-cement or the like, or metal sheeting fixed to the metal frame.” Clause 13.2.5(6) excludes walls constructed using insulated sandwich panels.
The explanatory information states: “For the purposes of 13.2.5(5)(b), expanded polystyrene strips greater than or equal to 12 mm thickness and timber greater than or equal to 20 mm thickness are deemed to achieve an R-Value greater than or equal to 0.2.”
For Part H6 and Section 13, the Glossary defines the envelope as “the parts of a building’s fabric that separate artificially heated or cooled spaces from— the exterior of the building; or other spaces that are not artificially heated or cooled.”
How is thermal bridging in a metal-framed roof addressed?
Clause 13.2.3(3) states: “The thermal bridging in a metal-framed roof must be addressed as follows”. For a pitched roof with a horizontal ceiling, it lists four options: achieving the Total R-Value in Table 13.2.3s “calculated using a method that accounts for the effects of thermal bridging”; “increasing the R-Value of the insulation between the ceiling frames by R0.5 more than the R-Value derived from (1)”; “adding a continuous ceiling insulation layer with a minimum R-Value of R0.13 above or below the ceiling joists or the bottom chords of the trusses”. The fourth option in NCC 2022 clause 13.2.3(3)(a) is to achieve the ceiling R-Value derived from 13.2.3(1) using two insulation layers immediately on top of each other, with the top layer covering the ceiling joists or truss bottom chords and having an R-Value of at least R0.5. For Table 13.2.3s, the calculation includes only the ceiling frame, insulation and ceiling lining, excluding internal air films, the roof space and roof lining.
For flat, skillion or cathedral roofs, 13.2.3(3)(b) lists achieving Table 13.2.3t’s Total R-Value using a calculation method that accounts for thermal bridging, or complying with Table 13.2.3u. Table 13.2.3u offers increased insulation between roof frame members (Option 1) or a continuous layer above or below them (Option 2); the table marks Option 1 as not permitted (“X = not permitted”) where the minimum ceiling insulation R-Value from Tables 13.2.3j to 13.2.3r is 3.5 or more. The table notes state that the minimum Total R-Values “are in-situ values. They account for compression of insulation.”
The explanatory information states: “The effect of thermal bridging through repeating framing elements such as ceiling joists and the bottom chord of ceiling trusses must be considered when calculating the Total R-Value of metal-framed roofs.” Clause 13.2.3(4) adds a vapour permeance condition for continuous insulation placed above the primary insulation layer where 10.8.3(1) applies.
How is thermal bridging in steel-framed walls and floors addressed?
Clause 13.2.5(4) states that thermal bridging in a metal-framed wall must be addressed by “achieving the Total R-Value in Tables 13.2.5p, 13.2.5q and 13.2.5r, calculated in accordance with AS/NZS 4859.2”, or “complying with one of the options in Tables 13.2.5s, 13.2.5t and 13.2.5u.”
For lightweight metal-framed walls, Table 13.2.5t lists, where wall insulation is above 0 and up to R1.5: “Either install reflective insulation outside the frame to create a minimum 20 mm reflective airspace between frame and cladding, or increase insulation between frames by R0.5.” Above R1.5, the second option becomes “a layer of continuous insulation with an R-Value of at least R0.30 on the inside or the outside of the frame.”
For masonry veneer metal-framed walls where the wall insulation R-Value from Tables 13.2.5c, 13.2.5g, 13.2.5i, 13.2.5k or 13.2.5m is greater than zero, Table 13.2.5u lists the following options: “Either install reflective insulation outside the frame to a minimum 20 mm reflective airspace between the frame and veneer, or add a layer of continuous insulation with an R-Value of at least R0.30 on the inside or the outside of the frame.” Table 13.2.5u specifies in-situ minimum R-Values accounting for compression and a maximum surface emittance of 0.1 for the reflective surface facing the airspace. Table 13.2.5t carries the same two notes.
Clause 13.2.6(3) lists achieving Table 13.2.6i’s Total R-Value using a method accounting for thermal bridging for suspended floors above enclosed subfloor spaces, or AS/NZS 4859.2 for other floors; alternatively, it lists compliance with an option in Table 13.2.6j. The explanatory information to 13.2.5 also notes that continuous insulation outside the primary layer “may also be subject to vapour permeance requirements of 10.8.1(2).”
Do thermal breaks still apply on the 7 star (software) route?
Volume Two clause H6D2(1) gives two Deemed-to-Satisfy routes for thermal performance: (a) “complying with S42C2, using house energy rating software and S42C4(1)”; or (b) complying with Parts 13.2, 13.3, 13.4 and 13.5 of the Housing Provisions. Clause 13.2.1(3) states: “Part 13.2 must be applied as directed in H6D2(1)(a) or (b).”
In the NCC 2022 text, clause S42C4(1) states that “in addition to S42C2, a building must comply with Section 13 of the ABCB Housing Provisions clauses” including “13.2.3(7) and 13.2.5(5), for thermal breaks”. The other items it lists are 13.2.2 for insulation, 13.2.3(5) for compensating for a loss of ceiling insulation “other than where the house energy rating software has compensated for a loss of ceiling insulation”, 13.2.6(4), (5) and (6) for floor edge insulation, and Part 13.4 for building sealing. H6V2(1)(b), the reference building Verification Method, also lists “clauses 13.2.3(7) and 13.2.5(5)” for thermal breaks.
South Australia’s energy provisions must also be checked against the applicable MBS 007; this note has not verified its current text, and the relevant authority assessing the building work should confirm the provisions applicable to the application. South Australian dates and concessions are discussed in the 7 star note.
H6D1(2) and clause A2G1(2) also allow the Performance Requirements to be met by a Performance Solution, or a combination of a Performance Solution and Deemed-to-Satisfy provisions.
Does South Australia change the thermal break rules?
No South Australian variation to Part 13.2 was found in the NCC 2022 schedules. The South Australian schedule to the Housing Provisions lists Parts 4.2, 9.2, 10.2 and 13.1 and its referenced documents; SA 13.1.2(2) states that, for Section 13, “a sunroom or the like is deemed to be a Class 10a building and must comply with 13.2.7.” The South Australian schedule to Volume Two has no entry for Part H6.
Ministerial Building Standard MBS 007, noted above, is a separate South Australian instrument outside the NCC schedules.
Who confirms the thermal break and bridging details?
The framing material, roof and wall build-ups, battens, insulation and any thermal break layer are recorded in the drawings, specification and energy assessment. Which route a design uses, and whether a roof or wall meets the clauses quoted here or relies on a Performance Solution, is for the designer and energy assessor to document and for the relevant authority assessing the building work to confirm.
The climate zone sets which insulation tables apply, and is covered in the climate zone note.
Common Questions
Does a steel frame need a thermal break under NCC 2022?
Under the NCC 2022 Housing Provisions, clause 13.2.5(5) requires a thermal break of at least R0.2 at all points of contact between the external cladding and a metal frame where the wall forms part of the building envelope, has no wall lining or a lining fixed directly to the frame, and is clad with weatherboards, fibre-cement or the like, or metal sheeting fixed to the frame. Clause 13.2.3(7) sets a similar R0.2 requirement for metal sheet roofing fixed directly to metal purlins, rafters or battens where there is no ceiling lining or the lining is fixed directly to those members. These are Deemed-to-Satisfy provisions: they apply on the elemental route and are listed in S42C4(1)(b) on the house energy rating software route. Clauses 13.2.3(8) and 13.2.5(6) exclude roofs and walls constructed using insulated sandwich panels from these respective thermal-break requirements. South Australia’s energy provisions must also be checked against the applicable MBS 007; this note has not verified its current text, and the relevant authority assessing the building work should confirm the provisions applicable to the application.
What counts as a thermal break of R0.2?
Where the NCC 2022 Deemed-to-Satisfy thermal-break provisions in 13.2.3(7) or 13.2.5(5) apply, they specify a thermal-break material with an R-Value of at least 0.2, subject to the insulated-sandwich-panel exclusions in 13.2.3(8) and 13.2.5(6). The explanatory information to clause 13.2.5 states that, for the purposes of 13.2.5(5)(b), “expanded polystyrene strips greater than or equal to 12 mm thickness and timber greater than or equal to 20 mm thickness are deemed to achieve an R-Value greater than or equal to 0.2.”
Is thermal bridging the same as a thermal break in the NCC?
In the NCC 2022 Housing Provisions they are separate requirements. The thermal break clauses (13.2.3(7) for roofs and 13.2.5(5) for walls) require an R0.2 layer between metal framing and the roofing or cladding in stated conditions. The thermal bridging clauses (13.2.3(3), 13.2.5(4) and 13.2.6(3)) require heat flow through metal-framed roofs, walls and floors to be addressed by achieving a Total R-Value in the listed tables or by listed options such as extra or continuous insulation.
Do thermal breaks apply if the house is assessed with NatHERS software?
In the NCC 2022 text, H6D2(1)(a) requires compliance with S42C2 using house energy rating software and with S42C4(1), and S42C4(1) lists “13.2.3(7) and 13.2.5(5), for thermal breaks” among the Housing Provisions clauses a building must also meet. South Australia’s energy provisions must also be checked against the applicable MBS 007; this note has not verified its current text, and the relevant authority assessing the building work should confirm the provisions applicable to the application.
What thermal bridging options apply to a brick veneer house with a steel frame?
For masonry veneer metal-framed walls, Table 13.2.5u of the NCC 2022 Housing Provisions lists, where the wall insulation R-Value is greater than 0, two options: “install reflective insulation outside the frame to a minimum 20 mm reflective airspace between the frame and veneer, or add a layer of continuous insulation with an R-Value of at least R0.30 on the inside or the outside of the frame.” Table 13.2.5u specifies in-situ minimum R-Values accounting for compression and a maximum surface emittance of 0.1 for the reflective surface facing the airspace. Clause 13.2.5(4) alternatively allows the Total R-Value in Table 13.2.5r, calculated in accordance with AS/NZS 4859.2.
Sources
- NCC 2022, ABCB Housing Provisions — Part 13.2 Building fabric (13.2.1, 13.2.2, 13.2.3, 13.2.5, 13.2.6 and Tables 13.2.3s–u, 13.2.5p–u)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Schedule 1 Definitions, Glossary (R-Value, Total R-Value, Envelope)Accessed 2026-11-23
- NCC 2022 Volume Two — Part H6 Energy efficiency (H6D1, H6D2, H6V2)Accessed 2026-11-23
- NCC 2022 Volume Two — Specification 42 House energy rating software (S42C4)Accessed 2026-11-23
- NCC 2022 Volume Two — Part A2 Compliance with the NCC (A2G1)Accessed 2026-11-23
- NCC 2022, ABCB Housing Provisions — Schedule 8 South Australia (index of variations) and SA 13.1.2Accessed 2026-11-23
- NCC 2022 Volume Two — Schedule 8 South Australia (index of variations)Accessed 2026-11-23
- ABCB — NCC 2025 state and territory adoption informationAccessed 2026-11-23
This page describes these sources as they stood on the access dates above. It is not legal advice about any particular property.