For this note, a feature survey means a measured record of existing site levels and features; confirm with the surveyor whether the commissioned work includes contours and which features will be recorded. Levels are given against a stated datum such as the Australian Height Datum (AHD). South Australia’s Survey Act 1992 defines a survey to include “any process of determining— (i) the form of land; or (ii) the position of a point, object, structure or feature on or in land, by the measurement of distances and angles … or by photogrammetry”. The Planning, Development and Infrastructure (General) Regulations 2017 do not use the term “feature survey”. Schedule 8 lists level and site information for application plans, subject to regulation 30(2)(a), which states that an applicant must not be required to meet a Schedule 8 requirement unless it is directly relevant to the application. The Schedule does not say how that information is to be obtained.

What does a feature survey record?
Section 4 of the Survey Act 1992 (SA) defines “survey” as “(a) a cadastral survey; or (b) any process of determining— (i) the form of land; or (ii) the position of a point, object, structure or feature on or in land, by the measurement of distances and angles (including measurement by means of an electronic device) or by photogrammetry”. The second limb describes the kind of measurement a feature survey involves: the shape of the ground and the position of things on it.
What a particular survey shows depends on what it is commissioned to show. For a house design, the items the application plans need (listed below) are a practical guide: existing ground levels, the kerb, existing buildings and floor levels, trees on the site and on adjoining land, driveways and vehicle crossovers, and the street drainage the site will discharge to.
Consumer and Business Services’ Form 1 (September 2024 version) uses the related term “contour survey” when it explains provisional sums: “if your building site slopes and no contour survey has been carried out, your building work contractor may not be able to prepare a final price for the earthworks needed to provide a level site for your domestic building work.”
What are AHD levels on a survey plan?
Geoscience Australia explains that in 1971 “Mean sea level for 1966-1968 was assigned a value of 0.000m on the Australian Height Datum (AHD) at 30 tide gauges around the coast of the Australian continent.” The datum surface, it says, “was adopted by the National Mapping Council at its twenty-ninth meeting in May 1971 as the datum to which all vertical control for mapping is to be referred.”
A level shown in AHD is therefore a height above that national reference surface, which allows levels on one site to be compared with levels in the street, on neighbouring land or in council drainage records. A survey can also be drawn to a local, assumed datum. Either way, the plan should state which datum its levels use, and every later drawing should use the same one.
What levels do SA planning and building application plans list?
For an application for planning consent for a new building, Schedule 8 clause 2(1)(a) of the General Regulations lists a site plan showing, among other items, “the boundaries and dimensions of the site”, and “existing ground and floor levels (if relevant), and proposed finished floor levels and proposed site (or “bench”) levels, including in relation to the top of any kerb level, showing the height and location of any earthworks or retaining walls (if relevant)”. Clause 2(1)(a)(v) adds “the location of any regulated tree on the site or on adjoining land that might be affected by the work, or that might affect the work, proposed to be performed”.
Clause 2(1)(c) lists elevation drawings showing “existing and proposed ground levels” and “proposed internal floor levels (relative to adjacent ground levels)”.
For an application for building consent, Schedule 8 clause 4(1)(a) lists a site plan, drawn to a scale of not less than 1:500, showing “the boundaries and dimensions of the site and any relevant easements”, the proposed building’s “relationship to the boundaries of the site and any other features such as other buildings or trees on the site or on adjoining land or public places that might be affected by the work or affect the work proposed to be performed”, and “the levels of the site and of the floors of the proposed building in relation to any street drainage channel or council drain”.
Regulation 30(2)(a) qualifies these lists: an applicant “must not be required to comply with a requirement under Schedule 8 unless the requirement is directly relevant to the application”. The Schedule lists what the plans must show; it does not say how the information is to be obtained. What a relevant authority will accept for a particular application is for that authority to confirm.
How do designers use a feature survey?
The survey is the base drawing the design sits on. From it the designer sets the floor level against the existing ground and the kerb, works out where the ground has to be cut or filled to make a building platform, locates retaining walls, plans the driveway gradient to the crossover, and checks that stormwater can fall to the street drainage or another approved point.
The same information feeds into pricing. Form 1 gives the example of earthworks on a sloping site priced as a provisional sum when no contour survey exists, with an “estimated figure which is subject to change when a survey plan is provided.” A survey made before design and pricing reduces that kind of unknown.
A feature survey records the surface. It does not test the soil. The CBS consumer guide gives a separate example of footings costs that “could vary depending on the results of a soil report”; site classification is covered in its own note.
Does a feature survey show the legal boundaries?
The Survey Act 1992 (SA) defines a cadastral survey as “any process of determining the boundaries of land by the measurement of distances and angles (including measurement by means of an electronic device) or by photogrammetry”. Section 15 states: “A person must not carry out a cadastral survey for fee or reward unless— (a) he or she is a licensed surveyor; or (b) he or she is acting under the supervision of a licensed surveyor; or (ba) the survey is carried out through the instrumentality of a licensed surveyor or a person acting under the supervision of a licensed surveyor; or (c) the survey is carried out as part of a course of training approved by the Institution of Surveyors.”
Section 14 deals separately with survey marks, which section 4 defines as “a mark or peg of a kind specified in survey instructions in force under this Act that is placed on or in land for the purposes of defining a boundary of the land; or a permanent survey mark”. A person must not personally place a survey mark on or in land unless he or she is a licensed surveyor, is acting under the supervision of a licensed surveyor, or the mark is placed in the course of a survey carried out as part of a course of training approved by the Institution of Surveyors.
The CBS consumer guide lists “exact boundaries of the land” among things to check before buying, and says “a registered surveyor can check and mark these out”. The Survey Act distinguishes a ‘licensed surveyor’ from a ‘registered surveyor’ (section 4); section 14 refers to a licensed surveyor, or a person under a licensed surveyor’s supervision, for personally placing a survey mark. A feature survey plan may show boundary lines, so it is worth asking the surveyor whether the boundaries shown were determined by a cadastral survey for this job or taken from existing records. Marking out the house on site is covered in the setout note.
When is the feature survey done?
Because the design is drawn over it, the survey belongs at the start of design, before floor levels, cut and fill and retaining walls are set. On a knockdown rebuild, the existing house, its floor level and the trees and services around it can be recorded before demolition. For land that has not yet been bought, the land checklist note covers what can be found out first.
A survey records the site on the day it is measured. If the site changes before design is finished (a tree removed, a fence moved, fill brought in), the survey may need updating for the areas that changed.
What to ask for when ordering a feature survey
Useful questions for the surveyor: which datum the levels use (AHD or an assumed datum); whether the kerb, the street drainage, the crossover and the neighbouring floor or ground levels near the boundary are included; whether trees on adjoining land near the boundary are shown; whether services in the street are located; and whether the boundaries were determined by a cadastral survey or drawn from existing records.
The answers decide whether the survey gives the designer what Schedule 8 of the General Regulations asks the plans to show. Whether the plans meet the requirements for a particular application is for the relevant authority or council for that address to confirm.
Common Questions
What is a feature survey?
For this note, a feature survey means a measured record of existing site levels and features, such as buildings, trees, fences, kerbs and services, used as the base for designing a house; confirm with the surveyor whether the commissioned work includes contours and which features will be recorded. South Australia’s Survey Act 1992 defines a survey to include “any process of determining— (i) the form of land; or (ii) the position of a point, object, structure or feature on or in land, by the measurement of distances and angles … or by photogrammetry”.
Is a contour survey the same as a feature survey?
The sources read for this note do not treat the two terms as synonyms. For this note, a feature survey means a measured record of existing site levels and features; confirm with the surveyor whether the commissioned work includes contours and which features will be recorded. CBS Form 1 in South Australia (September 2024 version) uses “contour survey” in its example of a provisional sum for earthworks on a sloping site. What a particular survey includes depends on what it was commissioned to show.
What does AHD mean on a survey plan?
AHD stands for Australian Height Datum. Geoscience Australia explains that mean sea level for 1966-1968 was assigned a value of 0.000 m on the AHD at 30 tide gauges around the Australian continent, and the datum was adopted in May 1971 as the reference for vertical control for mapping. A level in AHD is a height above that reference surface; a survey plan should state which datum its levels use.
Do SA development application plans need site levels?
Schedule 8 of South Australia’s Planning, Development and Infrastructure (General) Regulations 2017 lists, for a planning consent application for a new building, a site plan showing existing ground and floor levels (if relevant), proposed finished floor levels and proposed site (“bench”) levels, including in relation to the top of any kerb level, and elevations showing existing and proposed ground levels. For building consent, it lists the levels of the site and floors in relation to any street drainage channel or council drain. Regulation 30(2)(a) states that an applicant “must not be required to comply with a requirement under Schedule 8 unless the requirement is directly relevant to the application”. The Schedule does not name a feature survey.
Who can mark land boundaries in South Australia?
Under section 15 of South Australia’s Survey Act 1992, a person must not carry out a cadastral survey (determining the boundaries of land by measurement) for fee or reward unless they are a licensed surveyor, act under a licensed surveyor’s supervision, the survey is carried out “through the instrumentality of a licensed surveyor or a person acting under the supervision of a licensed surveyor”, or it is part of approved training. Section 14 separately provides that a person must not personally place a survey mark (defined in section 4 as a mark or peg of a kind specified in survey instructions, placed for the purpose of defining a boundary of the land, or a permanent survey mark) unless they are a licensed surveyor, are acting under a licensed surveyor’s supervision, or the mark is placed in an approved training survey.
Sources
- Survey Act 1992 (SA), authorised version 1.1.2021 — sections 4, 14 and 15Accessed 2026-11-23
- Planning, Development and Infrastructure (General) Regulations 2017 (SA), version 29.10.2026 — regulation 30(2) and Schedule 8 Plans, clauses 2 and 4Accessed 2026-11-23
- Geoscience Australia — Australian Height Datum (AHD)Accessed 2026-11-23
- Consumer and Business Services — Form 1: Your building contract: your rights and obligations (September 2024 version; Wayback snapshot of 1 December 2025), item 8Accessed 2026-11-23
- Consumer and Business Services — Building, extending & renovating a home: A consumer guide, January 2025 (Wayback snapshot of 27 November 2025)Accessed 2026-11-23
This page describes these sources as they stood on the access dates above. It is not legal advice about any particular property.